Young St — The Friend Compound Field Guide

Young St

Type

A New ADU and an Existing Primary Home

Regulatory Approach

ADU

City

San Mateo (Peninsula)

Financials

Total Cost: $2.2m

of Homes: 2

Cost per home: $1.1m
Timeline: 10 months

Before

Click to enlarge

After

Click to enlarge

Development Approach

This compound used the following regulatory approach to develop the homes shown.

Qualified for an ADU

This property qualifies for a new detached ADU.

Qualified for SB9 Single Family Development with Optional Lot Split

This property qualifies for SB9 development and may use a lot split for 1 new primary home and up to 2 new ADUs.

Not Applicable: SB684 Multifamily

SB684 does not apply: not multi-family zoned.

Not Applicable: SB1123 Small-Lot

SB1123 does not apply: property is not vacant.

Timeline

Phase Duration
Design 1 month
Permitting 3 months
Site Work 1 month
Construction 5 months
Total Duration 10 months

Financials

Total Project Cost

Total Project Cost: $2,166,184
2 new units · 1,000 new sq ft

Breakdown

Unit Economics

Original Property Build New Homes Total project
# of original homes 1 1 2
Per Home $1.34M $827K $1.08M
# of original sq ft 1,963 1,000 2,963
Per Sq Ft $682 $827 $731

Financing Estimate

Want to build something like this?

Share your goals and we'll figure out next steps.

Get started

More Compounds

Wildwood Drive: A Single-Family Home and Two New ADUs with an Existing Primary Home
View More About Wildwood

Alabama Street: Three New Duplex Townhomes
View More About Alabama
Explore every listing in the field guide